A US startup sent us a drawing for an aluminum bracket. The wall was too thin and would crack during machining. Our engineer flagged it in the DFM review. We changed one radius, kept the strength and cut the cost by 18%.
The first batch was 50 parts in 5 days. The customer then ordered 5,000 parts a month for full production. Three years later, we still make that part for them.
- 18%Cost saved by DFM
- 5 daysFirst batch delivered
- 3 yearsStill a customer today
Names withheld under NDA. Ask us for more case studies that match your industry.